Who works which day
See every actor's shoot days on one grid, and decide whether to keep paying someone between their work days or let them go and bring them back.
Why it matters
An actor who works on day 2 and again on day 13 is usually still paid for the days in between. They're held: on call, kept free for you, and on your payroll. Hold a few actors through long gaps without noticing and you've paid for weeks of nobody working.
Who works which day (Day Out of Days) is worked out from the shooting order. It shows every work day and every held day, and lets you drop someone through a long gap instead.
Watch
The grid
One row per cast member, one column per shoot day. Each cell holds a code, so you can read it without the colours.

- For switches the grid from Cast to another kind of need, such as Crowd in the background, or to Locations.
- A gap longer than this many calendar days suggests a drop, once per person. The app says the SAG-AFTRA theatrical rule is 10.
- #4 Maggie: works from day 2 to day 18, with short gaps.
- #5 the cook: works days 2, 13 and 18. The app drops him after day 2 (SWD) and picks him up on day 13 (PW), so the days between are blank.
- The key. The grid is wider than the window: scroll it sideways to see the totals.
The key, as the app writes it:
| Code | The app's key | In plain words |
|---|---|---|
| SW | first day | Start work: the first day this person works. |
| W | working | A work day. |
| WF | last day | Work finish: the last day. |
| SWF | only day | Starts and finishes on the same day. |
| H | held (paid, on call) | Not working, but paid to stay free for you. |
| WD | dropped after this day | Works, then is let go until a later day. You'll also see SWD when that's their first day. |
| PW | picked up | Brought back after a drop. PWF when that's also the last day. |
| TR | travel | A travel day, added by hand. |
| FT | fitting | A costume fitting, added by hand. |
| R | rehearsal | A rehearsal day, added by hand. |
The cells are shaded too: work days in green (a deeper green on first, last and pick-up days), held days in yellow, travel, fitting and rehearsal days in blue. The code is always written in the cell. The totals at the right end of each row (Work, Hold, Travel, Fitting, Rehrs., Total) count every paid day.
Hold or drop?
Select a row to see that person's Gaps between work days. Each gap says how many shoot days it covers over how many calendar days, and whether it's held or dropped, with a Hold / Drop switch.

- Paid days: 10 working plus 7 held makes 17.
- Gaps between work days: one line per gap.
- Hold keeps paying them through the gap. Drop lets them go and picks them up on their next work day.
Short gaps are held. For a gap longer than the number of calendar days in the setting (10), the app suggests a drop instead, and only once per person, because an actor can usually be dropped and picked up just once. The cook's first gap runs from day 2 to day 13, 13 calendar days, so the app drops him there.

- SWD: the cook's first day, and he's dropped after it.
- PW: picked up again on day 13. The blank days between aren't paid.
- 7 paid days: 3 working and 4 held.
- dropped (suggested): the app's own choice for a gap this long. The switch shows Drop.
You always have the last word. Choose Hold or Drop on any gap and the line says (by hand), with Use the suggestion beside it to put the app's choice back.
- Hold a short gap. The actor stays booked, so they can't take another job and leave you without them, and a day or two of holds costs less than the risk.
- Drop a long gap. Paying someone to sit at home for a week or more is money you could spend on screen.
- On a union shoot, follow the union's rule: under SAG-AFTRA theatrical terms a drop needs more than 10 days between work days. On a non-union shoot, your deal memo with the actor sets the rule.
Holds are paid days. In lesson 7 you'll see each cast member's paid days arrive in the budget as a number that follows the schedule: drop someone here and their budget line drops too.
Before there are shoot days
This screen counts shoot days, and the shooting order's day breaks make them. With none, it stays empty and says so.

Try it
- In Last Light, under Scheduling, choose Who works which day. (If it isn't open, choose Open the sample film on the start screen first.)
- Find #4 Maggie and #5 the cook. Scroll the grid sideways to the totals: Maggie has 17 under Total (10 working, 7 held); the cook has 7 (3 working, 4 held).
- Select Maggie's row. Under Gaps between work days, read her three gaps: 1 shoot day to 3 shoot days each, all held. Leave them on Hold: they're short, and you need her back every few days.
- Select the cook's row. His first gap reads 10 shoot days over 13 calendar days: dropped (suggested). 13 calendar days is longer than 10, so the app drops him after day 2 (SWD) and picks him up on day 13 (PW).
- To see what the suggestion saves, choose Hold on that gap. The blank days fill with H, the line says held (by hand), and the panel now says 17 paid days.
- Choose Use the suggestion. The cook is dropped again, back to 7 paid days. Holding him would have cost 10 more paid days of a cook sitting at home.
Check your work

- The held days: every day between day 2 and day 13 is now H, and paid.
- 17 paid days: 3 working and 14 held, 10 more than the suggestion.
- held (by hand): your choice, not the app's.
- Use the suggestion puts this gap back to what the app suggested: dropped.
Quick check
Pick an answer to see why it is or isn’t right. Nothing is scored.
Question 1
Your 1st AD says a day player works on day 2 and not again until day 15, two weeks later. The grid shows them held every day in between. What do you do?
Question 2
Your producer wants to save money by dropping Maggie for her gap of 3 shoot days over 4 calendar days. What do you tell them?
Question 3
You open Who works which day in a new project and it says This fills in once the shooting order has day breaks. What's missing?