Learn C-47 Production Engine
Lesson 18 minutesSample film: Last Light

One file, every stage

Every stage of preproduction, from the script to the budget, lives in one project file. Learn where each one is, and how to get a plain answer to any term on screen.

Why it matters

On a small shoot, the schedule usually lives in one spreadsheet, the budget in another and the call sheets in a third. Change one scene and you have to remember every place it lands. The one you forget is the one that costs you a day.

C-47 keeps every stage in one project file. The breakdown, the shooting order, who works which day, the daily plans and the budget are all worked out from the same script, so a change in one place reaches the rest.

Watch

The start screen offers two made-up projects to explore. Last Light is an 18-day feature filled in from script to budget. It's the one this course uses most.

The C-47 start screen: the title C-47 Production Engine, buttons to start a new project, start from a script file or open a project file, and a Samples to explore card with Last Light and Night Shift. Callout 1 marks the Open the sample film button.
The start screen.
  1. Open the sample film opens Last Light.

Inside a project, the sidebar lists every stage, grouped the way a production works through them.

The C-47 workspace with Last Light open on the Shooting order screen. The sidebar on the left groups the stages under Writing, Breakdown and design, Scheduling and Budget. Callouts mark the four group headings, the selected Shooting order entry with Stripboard beneath it, and the What is this? link under the screen heading.
The workspace, open on the shooting order.
  1. Writing: the cover page, the script and the story bible.
  2. Breakdown and design: what each scene needs, and the look and feel.
  3. Scheduling: the prep calendar, the shooting order, who works which day and the daily plans.
  4. Budget: what it costs.
  5. Every stage shows its plain name first and the industry term under it: Shooting order, then Stripboard.
  6. What is this? opens a short definition of the industry term, with its source.

Because every stage works from the same project, a change flows forward on its own:

How a change flows: Script (Screenplay), then What each scene needs (Breakdown), then Shooting order (Stripboard), then Who works which day (Day Out of Days), then Daily plans (Call sheets), then What it costs (Budget)ScriptScreenplayWhat eachscene needsBreakdownShooting orderStripboardWho workswhich dayDay Out of DaysDaily plansCall sheetsWhat it costsBudget

Every industry term the app uses is in one place, Words and terms at the bottom of the sidebar, with a search box. There are 58 of them.

The Words and terms screen with eighths typed in the search box. Two cards show: Scene length, in eighths of a page (industry term: page count in eighths), and One page per scene of everything it needs (industry term: breakdown sheet), each with a definition and a source.
Words and terms, searched for eighths.
  1. Type any part of a term, in plain words or industry words.

Try it

  1. Open C-47 Production Engine.
  2. On the start screen, under Samples to explore, choose Open the sample film.
  3. In the sidebar, under Scheduling, choose Shooting order.
  4. Under the heading, choose What is this?. Read the card, then choose Close.
  5. At the bottom of the sidebar, choose Words and terms and search for hold. Read what a hold day is. You'll need it in lesson 5.

Check your work

The Shooting order screen with the term card open: Shooting order, industry term Stripboard (production board), and the definition: one colored strip per scene, in the order you plan to shoot, split into days, with its source.
After step 4, the term card sits under the heading. Yours should look like this.
Watch outThe samples don't save themselves. The status line under the title says Not saved to a file yet · a safety copy is kept automatically. Try anything you like; if you want to keep your changes, use Save as… and give the file a new name.

Quick check

Pick an answer to see why it is or isn’t right. Nothing is scored.

Question 1

Someone on your team asks to see the stripboard. Where do you go?

Question 2

Your 1st AD says an actor is on a hold day. You don't know the term. What's the quickest way to find out?

Question 3

You cut a scene from the script. Which stages pick up the change without you copying anything across?

Written for C-47 Production Engine 0.9.2 beta. Screens may change as the beta does. · Savage Light Studios